Main menu

Plasmid sequencing from DNA using SQK-RBK114 (.24 or .96) (PRB_9188_v114_revI_09May2025)


DateVersionLanguageDeviceChanges
8/8/2025PRB_9188_v114_revI_09May2025EnglishGridION
09 May 2025 - Protocol title update
8/8/2025PRB_9188_v114_revI_09May2025EnglishMinION
09 May 2025 - Protocol title update
12/11/2024PRB_9188_v114_revH_11Dec2024EnglishGridION
11 December 2024 - Addition of links to MinION Mk1D IT requirements in "Compatibility of this protocol" and user manual in "Data acquisition and basecalling", "How to start sequencing". - Updated link for EPI2ME. - Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell. - Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells. - Updated link for MinION temperature control in "Issues during a sequencing run", "Failed to reach target temperature".
12/11/2024PRB_9188_v114_revH_11Dec2024EnglishMinION
11 December 2024 - Addition of links to MinION Mk1D IT requirements in "Compatibility of this protocol" and user manual in "Data acquisition and basecalling", "How to start sequencing". - Updated link for EPI2ME. - Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell. - Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells. - Updated link for MinION temperature control in "Issues during a sequencing run", "Failed to reach target temperature".
11/15/2024PRB_9188_v114_revG_20Nov2024EnglishGridION
November 2024 - Updated kit content information and image to include new kit format for SQK-RBK114.24 with plated rapid barcodes.
11/15/2024PRB_9188_v114_revG_20Nov2024EnglishMinION
November 2024 - Updated kit content information and image to include new kit format for SQK-RBK114.24 with plated rapid barcodes.
9/30/2024PRB_9188_v114_revF_30Sept2024EnglishGridION
30th September 2024 - Moved protocol out of early access phase, removed early access wording.
9/30/2024PRB_9188_v114_revF_30Sept2024EnglishMinION
30th September 2024 - Moved protocol out of early access phase, removed early access wording.
6/25/2024PRB_9188_v114_revE_17May2023EnglishGridION
14th November 2023 - Updated GridION branch to include troubleshooting section
6/25/2024PRB_9188_v114_revE_17May2023EnglishMinION
14th November 2023 - Updated GridION branch to include troubleshooting section
November 14th, 2023PRB_9188_v114_revC_17May2023EnglishGridion Download 3rd October 2023 - Checklist removed due to formatting issues
November 14th, 2023PRB_9188_v114_revC_17May2023EnglishMinion Download 3rd October 2023 - Checklist removed due to formatting issues
October 3rd, 2023PRB_9188_v114_revB_17May2023EnglishGridion Download 19th September 2023 - Updated flow cell loading instructions to include light shield installation
October 3rd, 2023PRB_9188_v114_revB_17May2023EnglishMinion Download 19th September 2023 - Updated flow cell loading instructions to include light shield installation
September 19th, 2023PRB_9188_v114_revA_17May2023EnglishGridion Download -
September 19th, 2023PRB_9188_v114_revA_17May2023EnglishMinion Download -

Getting started

Buy a MinION starter pack Nanopore store Sequencing service providers Channel partners

Nanopore technology

Subscribe to Nanopore updates Resources and publications What is the Nanopore Community

About Oxford Nanopore

News Company timeline Sustainability Leadership team Media resources & contacts For investors For partners Working at Oxford Nanopore Current vacancies Commercial information BSI 27001 accreditationBSI 90001 accreditationBSI mark of trust
English flag