11 December 2024
- Addition of links to MinION Mk1D IT requirements in "Compatibility of this protocol" and user manual in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for EPI2ME.
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during a sequencing run", "Failed to reach target temperature".
12/11/2024
PRB_9188_v114_revH_11Dec2024
English
MinION
11 December 2024
- Addition of links to MinION Mk1D IT requirements in "Compatibility of this protocol" and user manual in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for EPI2ME.
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during a sequencing run", "Failed to reach target temperature".
11/15/2024
PRB_9188_v114_revG_20Nov2024
English
GridION
November 2024
- Updated kit content information and image to include new kit format for SQK-RBK114.24 with plated rapid barcodes.
11/15/2024
PRB_9188_v114_revG_20Nov2024
English
MinION
November 2024
- Updated kit content information and image to include new kit format for SQK-RBK114.24 with plated rapid barcodes.
9/30/2024
PRB_9188_v114_revF_30Sept2024
English
GridION
30th September 2024
- Moved protocol out of early access phase, removed early access wording.
9/30/2024
PRB_9188_v114_revF_30Sept2024
English
MinION
30th September 2024
- Moved protocol out of early access phase, removed early access wording.
6/25/2024
PRB_9188_v114_revE_17May2023
English
GridION
14th November 2023
- Updated GridION branch to include troubleshooting section
6/25/2024
PRB_9188_v114_revE_17May2023
English
MinION
14th November 2023
- Updated GridION branch to include troubleshooting section
ONT plc is a member of the producer compliance scheme run by ERP UK Ltd, who manage the submission of documentation in support of WEEE compliance for ONT plc’s manufacture and supply of Electrical and Electronic equipment in the UK.