08th May 2025
- Added information for SQK-RPB114.24 kit format update from vials to plate.
- Included instructions for both kit formats: old vial format with Rapid Barcode Primers at 10 μM, new plate format with Rapid Barcode Primers at 1 μM.
5/29/2025
RPB_9191_v114_revG_07May2025
English
GridION
08th May 2025
- Added information for SQK-RPB114.24 kit format update from vials to plate.
- Included instructions for both kit formats: old vial format with Rapid Barcode Primers at 10 μM, new plate format with Rapid Barcode Primers at 1 μM.
5/29/2025
RPB_9191_v114_revG_07May2025
English
MinION
08th May 2025
- Added information for SQK-RPB114.24 kit format update from vials to plate.
- Included instructions for both kit formats: old vial format with Rapid Barcode Primers at 10 μM, new plate format with Rapid Barcode Primers at 1 μM.
5/29/2025
RPB_9191_v114_revG_07May2025
English
PromethION
08th May 2025
- Added information for SQK-RPB114.24 kit format update from vials to plate.
- Included instructions for both kit formats: old vial format with Rapid Barcode Primers at 10 μM, new plate format with Rapid Barcode Primers at 1 μM.
5/7/2025
RPB_9191_v114_revG_07May2025
English
Flongle
08th May 2025
- Added information for SQK-RPB114.24 kit format update from vials to plate.
- Included instructions for both kit formats: old vial format with Rapid Barcode Primers at 10 μM, new plate format with Rapid Barcode Primers at 1 μM.
5/7/2025
RPB_9191_v114_revG_07May2025
English
GridION
08th May 2025
- Added information for SQK-RPB114.24 kit format update from vials to plate.
- Included instructions for both kit formats: old vial format with Rapid Barcode Primers at 10 μM, new plate format with Rapid Barcode Primers at 1 μM.
5/7/2025
RPB_9191_v114_revG_07May2025
English
MinION
08th May 2025
- Added information for SQK-RPB114.24 kit format update from vials to plate.
- Included instructions for both kit formats: old vial format with Rapid Barcode Primers at 10 μM, new plate format with Rapid Barcode Primers at 1 μM.
5/7/2025
RPB_9191_v114_revG_07May2025
English
PromethION
08th May 2025
- Added information for SQK-RPB114.24 kit format update from vials to plate.
- Included instructions for both kit formats: old vial format with Rapid Barcode Primers at 10 μM, new plate format with Rapid Barcode Primers at 1 μM.
1/28/2025
RPB_9191_v114_revF_11Dec2024
English
Flongle
28th January 2025
- In the Flongle branch of "Equipment and consumables", information about the Flongle Sequencing Expansion has been updated to remove references to the older version of the kit.
1/28/2025
RPB_9191_v114_revF_11Dec2024
English
GridION
28th January 2025
- In the Flongle branch of "Equipment and consumables", information about the Flongle Sequencing Expansion has been updated to remove references to the older version of the kit.
1/28/2025
RPB_9191_v114_revF_11Dec2024
English
MinION
28th January 2025
- In the Flongle branch of "Equipment and consumables", information about the Flongle Sequencing Expansion has been updated to remove references to the older version of the kit.
1/28/2025
RPB_9191_v114_revF_11Dec2024
English
PromethION
28th January 2025
- In the Flongle branch of "Equipment and consumables", information about the Flongle Sequencing Expansion has been updated to remove references to the older version of the kit.
12/11/2024
RPB_9191_v114_revE_11Dec2024
English
Flongle
11th December 2024
- Addition of link to MinION Mk1D IT requirements in "Compatibility of this protocol" and links to MinION Mk1B/Mk1D user manuals in "Data acquisition and basecalling", "How to start sequencing".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell.
- Updated link to EPI2ME in "Downstream analysis", "EPI2ME workflows".
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during a sequencing run", "Failed to reach target temperature".
12/11/2024
RPB_9191_v114_revE_11Dec2024
English
GridION
11th December 2024
- Addition of link to MinION Mk1D IT requirements in "Compatibility of this protocol" and links to MinION Mk1B/Mk1D user manuals in "Data acquisition and basecalling", "How to start sequencing".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell.
- Updated link to EPI2ME in "Downstream analysis", "EPI2ME workflows".
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during a sequencing run", "Failed to reach target temperature".
12/11/2024
RPB_9191_v114_revE_11Dec2024
English
MinION
11th December 2024
- Addition of link to MinION Mk1D IT requirements in "Compatibility of this protocol" and links to MinION Mk1B/Mk1D user manuals in "Data acquisition and basecalling", "How to start sequencing".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell.
- Updated link to EPI2ME in "Downstream analysis", "EPI2ME workflows".
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during a sequencing run", "Failed to reach target temperature".
12/11/2024
RPB_9191_v114_revE_11Dec2024
English
PromethION
11th December 2024
- Addition of link to MinION Mk1D IT requirements in "Compatibility of this protocol" and links to MinION Mk1B/Mk1D user manuals in "Data acquisition and basecalling", "How to start sequencing".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell.
- Updated link to EPI2ME in "Downstream analysis", "EPI2ME workflows".
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during a sequencing run", "Failed to reach target temperature".
10/16/2024
RPB_9191_v114_revD_16Oct2024
English
Flongle
16th October 2024
- Updated Introduction to the protocol to the slimmed down structure.
- Updated reagent use from LongAmp Taq 2X Master Mix (e.g. NEB, cat # M0287) to newly recommended LongAmp Hot Start Taq 2X Master Mix (NEB, M0533).
10/16/2024
RPB_9191_v114_revD_16Oct2024
English
GridION
16th October 2024
- Updated Introduction to the protocol to the slimmed down structure.
- Updated reagent use from LongAmp Taq 2X Master Mix (e.g. NEB, cat # M0287) to newly recommended LongAmp Hot Start Taq 2X Master Mix (NEB, M0533).
10/16/2024
RPB_9191_v114_revD_16Oct2024
English
MinION
16th October 2024
- Updated Introduction to the protocol to the slimmed down structure.
- Updated reagent use from LongAmp Taq 2X Master Mix (e.g. NEB, cat # M0287) to newly recommended LongAmp Hot Start Taq 2X Master Mix (NEB, M0533).
10/16/2024
RPB_9191_v114_revD_16Oct2024
English
PromethION
16th October 2024
- Updated Introduction to the protocol to the slimmed down structure.
- Updated reagent use from LongAmp Taq 2X Master Mix (e.g. NEB, cat # M0287) to newly recommended LongAmp Hot Start Taq 2X Master Mix (NEB, M0533).
9/17/2024
RPB_9191_v114_revC_17Sep2024
English
Flongle
17th September 2024
- Protocol checklist now available.
- Included clarification in the PCR amplification conditions that 14 cycles is recommended as a starting point but can be adjusted depending on experiment needs.
9/17/2024
RPB_9191_v114_revC_17Sep2024
English
GridION
17th September 2024
- Protocol checklist now available.
- Included clarification in the PCR amplification conditions that 14 cycles is recommended as a starting point but can be adjusted depending on experiment needs.
9/17/2024
RPB_9191_v114_revC_17Sep2024
English
MinION
17th September 2024
- Protocol checklist now available.
- Included clarification in the PCR amplification conditions that 14 cycles is recommended as a starting point but can be adjusted depending on experiment needs.
9/17/2024
RPB_9191_v114_revC_17Sep2024
English
PromethION
17th September 2024
- Protocol checklist now available.
- Included clarification in the PCR amplification conditions that 14 cycles is recommended as a starting point but can be adjusted depending on experiment needs.
9/19/2023
RPB_9191_v114_revB_28Jun2023
English
Flongle
19th September 2023
- Updated flow cell loading instructions to include light shield installation
9/19/2023
RPB_9191_v114_revB_28Jun2023
English
GridION
19th September 2023
- Updated flow cell loading instructions to include light shield installation
9/19/2023
RPB_9191_v114_revB_28Jun2023
English
MinION
19th September 2023
- Updated flow cell loading instructions to include light shield installation
9/19/2023
RPB_9191_v114_revB_28Jun2023
English
PromethION
19th September 2023
- Updated flow cell loading instructions to include light shield installation
ONT plc is a member of the producer compliance scheme run by ERP UK Ltd, who manage the submission of documentation in support of WEEE compliance for ONT plc’s manufacture and supply of Electrical and Electronic equipment in the UK.