02 July 2025
- Updated workflow image
- Added information for SQK-PCB114.24 kit format update from vials to plate.
- Included instructions for both kit formats: old vial format with Barcode Primers at 10 μM, new plate format with Barcode Primers at 1 μM
8/21/2025
PCB_9201_v114_revF_02Jul2025
English
MinION
02 July 2025
- Updated workflow image
- Added information for SQK-PCB114.24 kit format update from vials to plate.
- Included instructions for both kit formats: old vial format with Barcode Primers at 10 μM, new plate format with Barcode Primers at 1 μM
8/21/2025
PCB_9201_v114_revF_02Jul2025
English
PromethION
02 July 2025
- Updated workflow image
- Added information for SQK-PCB114.24 kit format update from vials to plate.
- Included instructions for both kit formats: old vial format with Barcode Primers at 10 μM, new plate format with Barcode Primers at 1 μM
8/21/2025
PCB_9201_v114_revF_02Jul2025
中文
GridION
02 July 2025
- Updated workflow image
- Added information for SQK-PCB114.24 kit format update from vials to plate.
- Included instructions for both kit formats: old vial format with Barcode Primers at 10 μM, new plate format with Barcode Primers at 1 μM
8/21/2025
PCB_9201_v114_revF_02Jul2025
中文
MinION
02 July 2025
- Updated workflow image
- Added information for SQK-PCB114.24 kit format update from vials to plate.
- Included instructions for both kit formats: old vial format with Barcode Primers at 10 μM, new plate format with Barcode Primers at 1 μM
8/21/2025
PCB_9201_v114_revF_02Jul2025
中文
PromethION
02 July 2025
- Updated workflow image
- Added information for SQK-PCB114.24 kit format update from vials to plate.
- Included instructions for both kit formats: old vial format with Barcode Primers at 10 μM, new plate format with Barcode Primers at 1 μM
7/2/2025
PCB_9201_v114_revF_02Jul2025
English
GridION
02 July 2025
- Updated workflow image
- Added information for SQK-PCB114.24 kit format update from vials to plate.
- Included instructions for both kit formats: old vial format with Barcode Primers at 10 μM, new plate format with Barcode Primers at 1 μM
7/2/2025
PCB_9201_v114_revF_02Jul2025
English
MinION
02 July 2025
- Updated workflow image
- Added information for SQK-PCB114.24 kit format update from vials to plate.
- Included instructions for both kit formats: old vial format with Barcode Primers at 10 μM, new plate format with Barcode Primers at 1 μM
7/2/2025
PCB_9201_v114_revF_02Jul2025
English
PromethION
02 July 2025
- Updated workflow image
- Added information for SQK-PCB114.24 kit format update from vials to plate.
- Included instructions for both kit formats: old vial format with Barcode Primers at 10 μM, new plate format with Barcode Primers at 1 μM
7/22/2025
PCB_9201_v114_revF_02Jul2025
中文
GridION
02 July 2025
- Updated workflow image
- Added information for SQK-PCB114.24 kit format update from vials to plate.
- Included instructions for both kit formats: old vial format with Barcode Primers at 10 μM, new plate format with Barcode Primers at 1 μM
7/22/2025
PCB_9201_v114_revF_02Jul2025
中文
MinION
02 July 2025
- Updated workflow image
- Added information for SQK-PCB114.24 kit format update from vials to plate.
- Included instructions for both kit formats: old vial format with Barcode Primers at 10 μM, new plate format with Barcode Primers at 1 μM
7/22/2025
PCB_9201_v114_revF_02Jul2025
中文
PromethION
02 July 2025
- Updated workflow image
- Added information for SQK-PCB114.24 kit format update from vials to plate.
- Included instructions for both kit formats: old vial format with Barcode Primers at 10 μM, new plate format with Barcode Primers at 1 μM
6/6/2025
PCB_9201_v114_revE_11Dec2024
English
GridION
11th December 2024
- Addition of links to MinION Mk1D IT requirements and user manual.
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for EPI2ME in "Downstream analysis".
- Updated optional instructions for control experiment using EXP-RCS001 and the RNA Control Strand (RCS) to include options for higher and lower concentration of the RCS vial depending on kit batch number.
6/6/2025
PCB_9201_v114_revE_11Dec2024
English
MinION
11th December 2024
- Addition of links to MinION Mk1D IT requirements and user manual.
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for EPI2ME in "Downstream analysis".
- Updated optional instructions for control experiment using EXP-RCS001 and the RNA Control Strand (RCS) to include options for higher and lower concentration of the RCS vial depending on kit batch number.
6/6/2025
PCB_9201_v114_revE_11Dec2024
English
PromethION
11th December 2024
- Addition of links to MinION Mk1D IT requirements and user manual.
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for EPI2ME in "Downstream analysis".
- Updated optional instructions for control experiment using EXP-RCS001 and the RNA Control Strand (RCS) to include options for higher and lower concentration of the RCS vial depending on kit batch number.
12/11/2024
PCB_9201_v114_revE_11Dec2024
English
GridION
11th December 2024
- Addition of links to MinION Mk1D IT requirements and user manual.
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for EPI2ME in "Downstream analysis".
- Updated optional instructions for control experiment using EXP-RCS001 and the RNA Control Strand (RCS) to include options for higher and lower concentration of the RCS vial depending on kit batch number.
12/11/2024
PCB_9201_v114_revE_11Dec2024
English
MinION
11th December 2024
- Addition of links to MinION Mk1D IT requirements and user manual.
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for EPI2ME in "Downstream analysis".
- Updated optional instructions for control experiment using EXP-RCS001 and the RNA Control Strand (RCS) to include options for higher and lower concentration of the RCS vial depending on kit batch number.
12/11/2024
PCB_9201_v114_revE_11Dec2024
English
PromethION
11th December 2024
- Addition of links to MinION Mk1D IT requirements and user manual.
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for EPI2ME in "Downstream analysis".
- Updated optional instructions for control experiment using EXP-RCS001 and the RNA Control Strand (RCS) to include options for higher and lower concentration of the RCS vial depending on kit batch number.
4/19/2024
PCB_9201_v114_revD_06Dec2023
English
GridION
19 April 2024
- Updated Library storage condition following "Selecting for full-length transcripts by PCR" to 4C for short-term storage.
- Removed storage recommendations following Rapid Adapter addition
4/19/2024
PCB_9201_v114_revD_06Dec2023
English
MinION
19 April 2024
- Updated Library storage condition following "Selecting for full-length transcripts by PCR" to 4C for short-term storage.
- Removed storage recommendations following Rapid Adapter addition
4/19/2024
PCB_9201_v114_revD_06Dec2023
English
PromethION
19 April 2024
- Updated Library storage condition following "Selecting for full-length transcripts by PCR" to 4C for short-term storage.
- Removed storage recommendations following Rapid Adapter addition
ONT plc is a member of the producer compliance scheme run by ERP UK Ltd, who manage the submission of documentation in support of WEEE compliance for ONT plc’s manufacture and supply of Electrical and Electronic equipment in the UK.