02nd July 2025
- Updated information for new kit format with increased Short Fragment Buffer (SFB) volume.
- Increased the timing for priming and loading the flow cell from 5 min to 10 min in Library preparation Table.
- In section 5, 'Priming and loading the MinION and GridION Flow Cell', an important note was added to the bottom of the section stating that when a flow cell is inserted into the MinION Mk1D and the lid is closed, there will be a small gap around the sides of the device.
7/2/2025
NBDT_9220_v114_revB_02Jul2025
English
MinION
02nd July 2025
- Updated information for new kit format with increased Short Fragment Buffer (SFB) volume.
- Increased the timing for priming and loading the flow cell from 5 min to 10 min in Library preparation Table.
- In section 5, 'Priming and loading the MinION and GridION Flow Cell', an important note was added to the bottom of the section stating that when a flow cell is inserted into the MinION Mk1D and the lid is closed, there will be a small gap around the sides of the device.
7/2/2025
NBDT_9220_v114_revB_02Jul2025
English
PromethION
02nd July 2025
- Updated information for new kit format with increased Short Fragment Buffer (SFB) volume.
- Increased the timing for priming and loading the flow cell from 5 min to 10 min in Library preparation Table.
- In section 5, 'Priming and loading the MinION and GridION Flow Cell', an important note was added to the bottom of the section stating that when a flow cell is inserted into the MinION Mk1D and the lid is closed, there will be a small gap around the sides of the device.
ONT plc is a member of the producer compliance scheme run by ERP UK Ltd, who manage the submission of documentation in support of WEEE compliance for ONT plc’s manufacture and supply of Electrical and Electronic equipment in the UK.