12 December 2024
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual in "Data acquisition and basecalling", "How to start sequencing".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during a sequencing run", "Failed to reach target temperature".
12/12/2024
DCS_9187_v114_revJ_12Dec2024
English
MinION
12 December 2024
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual in "Data acquisition and basecalling", "How to start sequencing".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during a sequencing run", "Failed to reach target temperature".
12/12/2024
DCS_9187_v114_revJ_12Dec2024
English
PromethION
12 December 2024
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual in "Data acquisition and basecalling", "How to start sequencing".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during a sequencing run", "Failed to reach target temperature".
7/31/2024
DCS_9187_v114_revI_31Jul2024
English
GridION
31 July 2024
- Changed reagent order addition in Library preparation/Adapter ligation and clean-up; Ligation Adapter (LA) added before Ligation Buffer (LB) and NEBNext Quick T4 Ligase
18th April 2024
- Included information for the current incompatibility with the default set-up for wf-transcriptomes with this method.
7/31/2024
DCS_9187_v114_revI_31Jul2024
English
MinION
31 July 2024
- Changed reagent order addition in Library preparation/Adapter ligation and clean-up; Ligation Adapter (LA) added before Ligation Buffer (LB) and NEBNext Quick T4 Ligase
18th April 2024
- Included information for the current incompatibility with the default set-up for wf-transcriptomes with this method.
7/31/2024
DCS_9187_v114_revI_31Jul2024
English
PromethION
31 July 2024
- Changed reagent order addition in Library preparation/Adapter ligation and clean-up; Ligation Adapter (LA) added before Ligation Buffer (LB) and NEBNext Quick T4 Ligase
18th April 2024
- Included information for the current incompatibility with the default set-up for wf-transcriptomes with this method.
1st August 2023
- Kit contents layout has been updated
- In priming and loading the flow cell, the flow cell priming mix instructions have been updated
1st August 2023
- Kit contents layout has been updated
- In priming and loading the flow cell, the flow cell priming mix instructions have been updated
1st August 2023
- Kit contents layout has been updated
- In priming and loading the flow cell, the flow cell priming mix instructions have been updated
07th March 2024
- Updated AMPure Beads (AXP) thaw and storage to be at room temperature in RNA degradation and second strand synthesis step
- Updated library loading recommendations to 35-50 fmols.
07th March 2024
- Updated AMPure Beads (AXP) thaw and storage to be at room temperature in RNA degradation and second strand synthesis step
- Updated library loading recommendations to 35-50 fmols.
07th March 2024
- Updated AMPure Beads (AXP) thaw and storage to be at room temperature in RNA degradation and second strand synthesis step
- Updated library loading recommendations to 35-50 fmols.
19th September 2023
- Updated flow cell loading instructions to include light shield installation
- Updated flow cell loading recommendations in the "Adapter ligation and clean-up" step.
19th September 2023
- Updated flow cell loading instructions to include light shield installation
- Updated flow cell loading recommendations in the "Adapter ligation and clean-up" step.
19th September 2023
- Updated flow cell loading instructions to include light shield installation
- Updated flow cell loading recommendations in the "Adapter ligation and clean-up" step.
ONT plc is a member of the producer compliance scheme run by ERP UK Ltd, who manage the submission of documentation in support of WEEE compliance for ONT plc’s manufacture and supply of Electrical and Electronic equipment in the UK.