29th August 2025
- In 'Compatibility of this protocol', under the PromethION branch, the PromethION 2 Integrated was included as a compatible device and the link to its user manual was added to 'Data acquisition and basecalling'.
8/29/2025
DRS_9219_v4_revD_29Aug2025
English
MinION
29th August 2025
- In 'Compatibility of this protocol', under the PromethION branch, the PromethION 2 Integrated was included as a compatible device and the link to its user manual was added to 'Data acquisition and basecalling'.
8/29/2025
DRS_9219_v4_revD_29Aug2025
English
PromethION
29th August 2025
- In 'Compatibility of this protocol', under the PromethION branch, the PromethION 2 Integrated was included as a compatible device and the link to its user manual was added to 'Data acquisition and basecalling'.
7/16/2025
DRS_9219_v4_revC_16Jul2025
English
GridION
16th July 2025
- In 'Data acquisition and Basecalling', 'To start a sequencing run on MinKNOW', the script for the standard RNA004 was replaced with the script for RNA004-XL in step 3, as a result of the update to MinKNOW.
7/16/2025
DRS_9219_v4_revC_16Jul2025
English
MinION
16th July 2025
- In 'Data acquisition and Basecalling', 'To start a sequencing run on MinKNOW', the script for the standard RNA004 was replaced with the script for RNA004-XL in step 3, as a result of the update to MinKNOW.
7/16/2025
DRS_9219_v4_revC_16Jul2025
English
PromethION
16th July 2025
- In 'Data acquisition and Basecalling', 'To start a sequencing run on MinKNOW', the script for the standard RNA004 was replaced with the script for RNA004-XL in step 3, as a result of the update to MinKNOW.
5/19/2025
DRS_9219_v4_revB_19May2025
English
GridION
19th May 2025
- In 'Overview', library preparation time was increased to ~140 min to align with Table and Figure in 'Steps in the sequencing workflow' where priming and loading of flow cell was increased from 5 min to 10 min.
- In section 4, 'Priming and loading the MinION/GridION Flow Cell'', an important note was added to the bottom of the section stating that when a flow cell is inserted into the MinION Mk1D and the lid is closed, there will be a small gap around the sides of the device.
5/19/2025
DRS_9219_v4_revB_19May2025
English
MinION
19th May 2025
- In 'Overview', library preparation time was increased to ~140 min to align with Table and Figure in 'Steps in the sequencing workflow' where priming and loading of flow cell was increased from 5 min to 10 min.
- In section 4, 'Priming and loading the MinION/GridION Flow Cell'', an important note was added to the bottom of the section stating that when a flow cell is inserted into the MinION Mk1D and the lid is closed, there will be a small gap around the sides of the device.
5/19/2025
DRS_9219_v4_revB_19May2025
English
PromethION
19th May 2025
- In 'Overview', library preparation time was increased to ~140 min to align with Table and Figure in 'Steps in the sequencing workflow' where priming and loading of flow cell was increased from 5 min to 10 min.
- In section 4, 'Priming and loading the MinION/GridION Flow Cell'', an important note was added to the bottom of the section stating that when a flow cell is inserted into the MinION Mk1D and the lid is closed, there will be a small gap around the sides of the device.
5/19/2025
DRS_9219_v4_revB_19May2025
English
GridION
19th May 2025
- In 'Overview', library preparation time was increased to ~140 min to align with Table and Figure in 'Steps in the sequencing workflow' where priming and loading of flow cell was increased from 5 min to 10 min.
- In section 4, 'Priming and loading the MinION/GridION Flow Cell'', an important note was added to the bottom of the section stating that when a flow cell is inserted into the MinION Mk1D and the lid is closed, there will be a small gap around the sides of the device.
5/19/2025
DRS_9219_v4_revB_19May2025
English
MinION
19th May 2025
- In 'Overview', library preparation time was increased to ~140 min to align with Table and Figure in 'Steps in the sequencing workflow' where priming and loading of flow cell was increased from 5 min to 10 min.
- In section 4, 'Priming and loading the MinION/GridION Flow Cell'', an important note was added to the bottom of the section stating that when a flow cell is inserted into the MinION Mk1D and the lid is closed, there will be a small gap around the sides of the device.
5/19/2025
DRS_9219_v4_revB_19May2025
English
PromethION
19th May 2025
- In 'Overview', library preparation time was increased to ~140 min to align with Table and Figure in 'Steps in the sequencing workflow' where priming and loading of flow cell was increased from 5 min to 10 min.
- In section 4, 'Priming and loading the MinION/GridION Flow Cell'', an important note was added to the bottom of the section stating that when a flow cell is inserted into the MinION Mk1D and the lid is closed, there will be a small gap around the sides of the device.
ONT plc is a member of the producer compliance scheme run by ERP UK Ltd, who manage the submission of documentation in support of WEEE compliance for ONT plc’s manufacture and supply of Electrical and Electronic equipment in the UK.