23 June 2025
- Updated Data acquisition and basecalling section of the protocol to be compatible with updated versions of MinKNOW.
6/23/2025
MRT_9186_v114_revJ_23Jun2025
English
MinION
23 June 2025
- Updated Data acquisition and basecalling section of the protocol to be compatible with updated versions of MinKNOW.
12/13/2024
MRT_9186_v114_revH_13Dec2024
English
GridION
13 December 2024
- Addition of link to MinION Mk1D IT requirements in "Computer requirements and software" and updated link for EPI2ME.
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell.
- Addition of MinION Mk1D user manual in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during a sequencing run", "Failed to reach target temperature".
12/13/2024
MRT_9186_v114_revH_13Dec2024
English
MinION
13 December 2024
- Addition of link to MinION Mk1D IT requirements in "Computer requirements and software" and updated link for EPI2ME.
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell.
- Addition of MinION Mk1D user manual in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during a sequencing run", "Failed to reach target temperature".
9/17/2024
MRT_9186_v114_revG_17Aug24
English
GridION
17th Sept 2024
- Fixed table formatting in PCR Section of protcocol, step 1.
9/17/2024
MRT_9186_v114_revG_17Aug24
English
MinION
17th Sept 2024
- Fixed table formatting in PCR Section of protcocol, step 1.
9/17/2024
MRT_9186_v114_revG_17Aug24
English
GridION
17th August 2024
- Fixed table formatting in PCR Section of protcocol, step 1.
9/17/2024
MRT_9186_v114_revG_17Aug24
English
MinION
17th August 2024
- Fixed table formatting in PCR Section of protcocol, step 1.
9/17/2024
MRT_9186_v114_revG_19Apr2023
English
GridION
02nd July 2024
- Fixed table formatting in PCR Section of protcocol, step 1.
9/17/2024
MRT_9186_v114_revG_19Apr2023
English
MinION
02nd July 2024
- Fixed table formatting in PCR Section of protcocol, step 1.
7/2/2024
MRT_9186_v114_revF_19Apr2023
English
GridION
02nd July 2024
- Included the following statement to the introduction to the protocol and the Midnight primer sequence information: 'As mutations in SARS-CoV-2 variants emerge amplicon drop out may be observed; for users wishing to design their own primer spike-ins to address this we suggest adding to the appropriate primer pool at a final concentration between 3.33 µM and 6.66 µM.'
7/2/2024
MRT_9186_v114_revF_19Apr2023
English
MinION
02nd July 2024
- Included the following statement to the introduction to the protocol and the Midnight primer sequence information: 'As mutations in SARS-CoV-2 variants emerge amplicon drop out may be observed; for users wishing to design their own primer spike-ins to address this we suggest adding to the appropriate primer pool at a final concentration between 3.33 µM and 6.66 µM.'
ONT plc is a member of the producer compliance scheme run by ERP UK Ltd, who manage the submission of documentation in support of WEEE compliance for ONT plc’s manufacture and supply of Electrical and Electronic equipment in the UK.