Date | Version | Language | Device | Changes | |
---|---|---|---|---|---|
10/4/2023 | GDA_9167_v114_revJ_24Aug2022 | English | PromethION | 4th October 2023 - Updated the format of the final step in the "Adapter ligation and clean-up" step for the checklist | |
September 27th, 2023 | GDA_9167_v114_revH_24Aug2022 | English | - | Download | 19th September 2023 - Updated flow cell loading instructions to include light shield installation - Updated flow cell loading recommendations in the "Adapter ligation and clean-up" step. |
September 19th, 2023 | GDA_9167_v114_revG_24Aug2022 | English | - | Download | 26th June 2023: - Instrument name standardised throughout protocol to Hamilton NGS STAR 96 - Updated equipment for discontinuation of the Roche Diagnostics MagNA Pure LC Medium Reagent Tubs 20 to Hamilton 20 ml Reagent Reservoirs |
May 3rd, 2023 | GDA_9167_v114_revF_24Aug2022 | English | - | Download | May 2023: - Included guideline protocol for loading multiple PromethION Flow Cells - This kit has moved to released phase. |
March 27th, 2023 | GDA_9167_v114_revE_24Aug2022 | English | - | Download | March 2023: - Included guideline protocol for loading multiple PromethION Flow Cells |
March 15th, 2023 | GDA_9167_v114_revD_24Aug2022 | English | - | Download | March 2023: - Updated the "Sequencing and data analysis" section to include further details about duplex basecalling |
January 25th, 2023 | GDA_9167_v114_revC_24Aug2022 | English | - | Download | January 2023 - Changed the "Priming and loading the PrometION flow cell" section to the updated version. |
October 3rd, 2022 | GDA_9167_v114_revB_24Aug2022 | English | Minion | Download | 03 October 2022: - Corrected Priming and Loading flow cell section of the protocol to link to the PromethION rather than the Min/Grid section. |
October 3rd, 2022 | GDA_9167_v114_revB_24Aug2022 | English | Promethion | Download | 03 October 2022: - Corrected Priming and Loading flow cell section of the protocol to link to the PromethION rather than the Min/Grid section. |
October 3rd, 2022 | GDA_9167_v114_revB_24Aug2022 | English | Gridion | Download | 03 October 2022: - Corrected Priming and Loading flow cell section of the protocol to link to the PromethION rather than the Min/Grid section. |
August 24th, 2022 | GDA_9167_v114_revA_24Aug2022 | English | - | Download | - |