11 December 2024
- Addition of links to MinION Mk1D IT requirements in "Compatibility of this protocol" and user manual in "Data acquisition and basecalling", "How to start sequencing".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during a sequencing run", "Failed to reach target temperature".
12/11/2024
RAA_9198_v114_revK_11Dec2024
English
MinION
11 December 2024
- Addition of links to MinION Mk1D IT requirements in "Compatibility of this protocol" and user manual in "Data acquisition and basecalling", "How to start sequencing".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during a sequencing run", "Failed to reach target temperature".
11/15/2024
RAA_9198_v114_revJ_20Nov2024
English
GridION
November 2024
- Updated kit content information and image to include new kit format for SQK-RBK114.24 with plated rapid barcodes.
11/15/2024
RAA_9198_v114_revJ_20Nov2024
English
MinION
November 2024
- Updated kit content information and image to include new kit format for SQK-RBK114.24 with plated rapid barcodes.
9/30/2024
RAA_9198_v114_revI_30Sept2024
English
GridION
30th September 2024
- Moved protocol out of early access phase, removed early access wording.
9/30/2024
RAA_9198_v114_revI_30Sept2024
English
MinION
30th September 2024
- Moved protocol out of early access phase, removed early access wording.
4/29/2024
RAA_9198_v114_revH_29Nov2023
English
GridION
29 April 2024
- Updated references to EPI2ME (no longer called EPI2ME Labs) throughout document.
4/29/2024
RAA_9198_v114_revH_29Nov2023
English
MinION
29 April 2024
- Updated references to EPI2ME (no longer called EPI2ME Labs) throughout document.
02 April 2024
- Added note to 'Introduction to amplicon sequencing using the Rapid Barcoding Kit 24 or 96 V14' to specify correct primer design prior to amplicon generation.
- Added "Important" section to 'Equipment and Consumables' highlighting primer design and consideractions prior to amplcion generation.
02 April 2024
- Added note to 'Introduction to amplicon sequencing using the Rapid Barcoding Kit 24 or 96 V14' to specify correct primer design prior to amplicon generation.
- Added "Important" section to 'Equipment and Consumables' highlighting primer design and consideractions prior to amplcion generation.
January 2024
- Added wording throughout protocol to clarify each sample/barcode should be associated to a single species amplicon (this method is not suitable for mixed species amplicon samples).
January 2024
- Added wording throughout protocol to clarify each sample/barcode should be associated to a single species amplicon (this method is not suitable for mixed species amplicon samples).
ONT plc is a member of the producer compliance scheme run by ERP UK Ltd, who manage the submission of documentation in support of WEEE compliance for ONT plc’s manufacture and supply of Electrical and Electronic equipment in the UK.