02 July 2025
- Updated information for new kit format with increased Short Fragment Buffer (SFB) volume.
- Increased the timing for priming and loading the flow cell from 5 min to 10 min in Library preparation Table.
7/2/2025
RRMS_9209_v114_revH_02Jul2025
English
PromethION
02 July 2025
- Updated information for new kit format with increased Short Fragment Buffer (SFB) volume.
- Increased the timing for priming and loading the flow cell from 5 min to 10 min in Library preparation Table.
6/13/2025
RRMS_9209_v114_revG_09May2025
English
PromethION
09 May 2025
- Protocol title update
4/29/2025
RRMS_9209_v114_revF_29Apr2025
English
PromethION
29 April 2025
- Updated "DNA fragmentation" and "DNA repair and end-prep" steps with correction to the expected DNA recovery and quantities taken forward into the library preparation
1/7/2025
RRMS_9209_v114_revE_07Jan2025
English
PromethION
07 January 2025
- Updated "DNA repair and end prep" incubation step to 20°C for 5 minutes, 65°C for 5 minutes. (was 20°C for 5 minutes, 60°C for 5 minutes)
1/7/2025
RRMS_9209_v114_revE_13Dec2024
English
PromethION
07 January 2025
- Updated "DNA repair and end prep" incubation step to 20°C for 5 minutes, 65°C for 5 minutes. (was 20°C for 5 minutes, 60°C for 5 minutes)
12/13/2024
RRMS_9209_v114_revD_13Dec2024
English
PromethION
13 December 2024
- Addition of MinION Mk1D device for RRMS in "Overview of the protocol".
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during a sequencing run", "Failed to reach target temperature".
11/15/2024
RRMS_9209_v114_revC_20Nov2024
English
PromethION
November 2024
- Updated kit content information and image to include new kit format of SQK-NBD114.24 with plated native barcodes.
8/20/2024
RRMS_9209_v114_revB_31Jul2024
English
PromethION
21 August 2024
- Updated downstream analysis section: recommended software versions.
- Included demux step in downstream analysis section.
ONT plc is a member of the producer compliance scheme run by ERP UK Ltd, who manage the submission of documentation in support of WEEE compliance for ONT plc’s manufacture and supply of Electrical and Electronic equipment in the UK.