15th October 2025
- Protocol was updated to align with current formatting.
- In section 1, 'Steps in the sequencing overflow', under 'Library preparation', the timing for priming and loading a flow cell was increased from 5 min to 10 min in the Table. And under 'Sequencing', Guppy was replaced with Dorado as an optional software for demultiplexing as Guppy is no longer supported.
- In section 4, 'Native barcode ligation', an important note was included to only use the barcode wells once.
- In section 5, 'Adapter ligation and clean-up', and section 6, 'Priming and loading multiple flow cells', a note was added to check your flow cell or complete a flow cell check.
- In 'Troubleshooting', video links for the MinION Flow Cell loading were replaced with the PromethION Flow Cell loading.
8/29/2025
MLK_9193_v114_revB_30Sep2024
English
PromethION
30th September 2024
- Moved protocol out of early access phase, removed early access wording.
- Removed references to duplex basecalling.
- Updated introduction section of the protocol to new format.
- Updated method workflow image.
9/30/2024
MLK_9193_v114_revB_30Sep2024
English
PromethION
30th September 2024
- Moved protocol out of early access phase, removed early access wording.
- Removed references to duplex basecalling.
- Updated introduction section of the protocol to new format.
- Updated method workflow image.
ONT plc is a member of the producer compliance scheme run by ERP UK Ltd, who manage the submission of documentation in support of WEEE compliance for ONT plc’s manufacture and supply of Electrical and Electronic equipment in the UK.