Main menu

Ultra-Long DNA Sequencing Kit V14 (SQK-ULK114) (ULK_9177_v114_revP_11Dec2024)


DateVersionLanguageDeviceChanges
12/11/2024ULK_9177_v114_revP_11Dec2024EnglishGridION
11 December 2024 - Addition of links to MinION Mk1D IT requirements in "Compatibility of this protocol" and user manual in "Data acquisition and basecalling", "How to start sequencing". - Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell. - Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
12/11/2024ULK_9177_v114_revP_11Dec2024EnglishMinION
11 December 2024 - Addition of links to MinION Mk1D IT requirements in "Compatibility of this protocol" and user manual in "Data acquisition and basecalling", "How to start sequencing". - Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell. - Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
12/11/2024ULK_9177_v114_revP_11Dec2024EnglishPromethION
11 December 2024 - Addition of links to MinION Mk1D IT requirements in "Compatibility of this protocol" and user manual in "Data acquisition and basecalling", "How to start sequencing". - Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell. - Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
7/2/2025ULK_9177_v114_revP_11Dec2024中文GridION
11 December 2024 - Addition of links to MinION Mk1D IT requirements in "Compatibility of this protocol" and user manual in "Data acquisition and basecalling", "How to start sequencing". - Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell. - Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
7/2/2025ULK_9177_v114_revP_11Dec2024中文MinION
11 December 2024 - Addition of links to MinION Mk1D IT requirements in "Compatibility of this protocol" and user manual in "Data acquisition and basecalling", "How to start sequencing". - Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell. - Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
7/2/2025ULK_9177_v114_revP_11Dec2024中文PromethION
11 December 2024 - Addition of links to MinION Mk1D IT requirements in "Compatibility of this protocol" and user manual in "Data acquisition and basecalling", "How to start sequencing". - Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell. - Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
11/27/2024ULK_9177_v114_revO_27Nov2024EnglishGridION
November 2024 - Updated layout of the "Introduction to the protocol" section to trimmed down format. - Updated kit content to include new batch format with improved Precipitation Star (PS) manufacturing and different layout. - Included instructions for "Clean-up" step in "Library preparation" for use with and without the Precipitation Star (PS) to accomodate users for older and newer batches of the kit.
11/27/2024ULK_9177_v114_revO_27Nov2024EnglishMinION
November 2024 - Updated layout of the "Introduction to the protocol" section to trimmed down format. - Updated kit content to include new batch format with improved Precipitation Star (PS) manufacturing and different layout. - Included instructions for "Clean-up" step in "Library preparation" for use with and without the Precipitation Star (PS) to accomodate users for older and newer batches of the kit.
11/27/2024ULK_9177_v114_revO_27Nov2024EnglishPromethION
November 2024 - Updated layout of the "Introduction to the protocol" section to trimmed down format. - Updated kit content to include new batch format with improved Precipitation Star (PS) manufacturing and different layout. - Included instructions for "Clean-up" step in "Library preparation" for use with and without the Precipitation Star (PS) to accomodate users for older and newer batches of the kit.
10/14/2024ULK_9177_v114_revN_14Oct2024EnglishGridION
14 October 2024 - Formatting updates to the sample preparation: uHMW gDNA extraction section of the protocol.
10/14/2024ULK_9177_v114_revN_14Oct2024EnglishMinION
14 October 2024 - Formatting updates to the sample preparation: uHMW gDNA extraction section of the protocol.
10/14/2024ULK_9177_v114_revN_14Oct2024EnglishPromethION
14 October 2024 - Formatting updates to the sample preparation: uHMW gDNA extraction section of the protocol.
6/21/2024ULK_9177_v114_revM_27Nov2022EnglishGridION
21 June 2024 - Throughout document replaced reference to "peripheral blood mononuclear cells (PBMCs)" with "white blood cells (WBCs)" to more accurately represent the samples obtained.
6/21/2024ULK_9177_v114_revM_27Nov2022EnglishMinION
21 June 2024 - Throughout document replaced reference to "peripheral blood mononuclear cells (PBMCs)" with "white blood cells (WBCs)" to more accurately represent the samples obtained.
6/21/2024ULK_9177_v114_revM_27Nov2022EnglishPromethION
21 June 2024 - Throughout document replaced reference to "peripheral blood mononuclear cells (PBMCs)" with "white blood cells (WBCs)" to more accurately represent the samples obtained.
February 8th, 2024ULK_9177_v114_revK_27Nov2022EnglishPromethion Download 07 February 2024 - gDNA quantification step made optional - Updated the Clean-up stage of the protocol to new method NOT using the Precipitation Star (PS) - Updated the Priming and loading the SpotON flow cell in the MinION/GridION branch to specify the MinION Flow Cell Light Shield should NOT be installed until after loading the DNA library. - Updated Flow Cell loading instructions specific to ULK libraries - Updated the Reloading ultra-long DNA library on both MinION/GridION and PromethION with updated wording and Flow Cell Wash protocol - Links updated in the Priming and Loading flow cell section when referencing the "Reloading ultra-long DNA library" to take user to V14 protocol. - Removed "Required settings in MinKNOW" as no longer required for run.
February 8th, 2024ULK_9177_v114_revK_27Nov2022EnglishGridion Download 07 February 2024 - gDNA quantification step made optional - Updated the Clean-up stage of the protocol to new method NOT using the Precipitation Star (PS) - Updated the Priming and loading the SpotON flow cell in the MinION/GridION branch to specify the MinION Flow Cell Light Shield should NOT be installed until after loading the DNA library. - Updated Flow Cell loading instructions specific to ULK libraries - Updated the Reloading ultra-long DNA library on both MinION/GridION and PromethION with updated wording and Flow Cell Wash protocol - Links updated in the Priming and Loading flow cell section when referencing the "Reloading ultra-long DNA library" to take user to V14 protocol. - Removed "Required settings in MinKNOW" as no longer required for run.
February 8th, 2024ULK_9177_v114_revK_27Nov2022EnglishMinion Download 07 February 2024 - gDNA quantification step made optional - Updated the Clean-up stage of the protocol to new method NOT using the Precipitation Star (PS) - Updated the Priming and loading the SpotON flow cell in the MinION/GridION branch to specify the MinION Flow Cell Light Shield should NOT be installed until after loading the DNA library. - Updated Flow Cell loading instructions specific to ULK libraries - Updated the Reloading ultra-long DNA library on both MinION/GridION and PromethION with updated wording and Flow Cell Wash protocol - Links updated in the Priming and Loading flow cell section when referencing the "Reloading ultra-long DNA library" to take user to V14 protocol. - Removed "Required settings in MinKNOW" as no longer required for run.
February 7th, 2024ULK_9177_v114_revJ_27Nov2022EnglishPromethion Download December 2023 - Updated compatibilities to include new expansions EEB Expansion (EXP-EEB001) and Ultra-Long Auxiliary Vials (EXP-ULA001).
February 7th, 2024ULK_9177_v114_revJ_27Nov2022EnglishGridion Download December 2023 - Updated compatibilities to include new expansions EEB Expansion (EXP-EEB001) and Ultra-Long Auxiliary Vials (EXP-ULA001).
February 7th, 2024ULK_9177_v114_revJ_27Nov2022EnglishMinion Download December 2023 - Updated compatibilities to include new expansions EEB Expansion (EXP-EEB001) and Ultra-Long Auxiliary Vials (EXP-ULA001).
December 6th, 2023ULK_9177_v114_revH_27Nov2022EnglishPromethion Download December 2023 - Updated compatibilities to include new expansions EEB Expansion (EXP-EEB001) and Ultra-Long Auxiliary Vials (EXP-ULA001).
December 6th, 2023ULK_9177_v114_revH_27Nov2022EnglishGridion Download December 2023 - Updated compatibilities to include new expansions EEB Expansion (EXP-EEB001) and Ultra-Long Auxiliary Vials (EXP-ULA001).
December 6th, 2023ULK_9177_v114_revH_27Nov2022EnglishMinion Download December 2023 - Updated compatibilities to include new expansions EEB Expansion (EXP-EEB001) and Ultra-Long Auxiliary Vials (EXP-ULA001).
December 6th, 2023ULK_9177_v114_revG_27Nov2022EnglishPromethion Download 19th September 2023 - Updated flow cell loading instructions to include light shield installation
December 6th, 2023ULK_9177_v114_revG_27Nov2022EnglishGridion Download 19th September 2023 - Updated flow cell loading instructions to include light shield installation
December 6th, 2023ULK_9177_v114_revG_27Nov2022EnglishMinion Download 19th September 2023 - Updated flow cell loading instructions to include light shield installation
September 19th, 2023ULK_9177_v114_revF_27Nov2022EnglishPromethion Download April 2023 - Updated the volumes for making up CSB in the "Preparation of tissue samples for gDNA extraction" step
September 19th, 2023ULK_9177_v114_revF_27Nov2022EnglishGridion Download April 2023 - Updated the volumes for making up CSB in the "Preparation of tissue samples for gDNA extraction" step
September 19th, 2023ULK_9177_v114_revF_27Nov2022EnglishMinion Download April 2023 - Updated the volumes for making up CSB in the "Preparation of tissue samples for gDNA extraction" step
April 6th, 2023ULK_9177_v114_revE_27Nov2022EnglishPromethion Download April 2023 - Updated the volumes for making up CSB in the "Preparation of tissue samples for gDNA extraction" step
April 6th, 2023ULK_9177_v114_revE_27Nov2022EnglishGridion Download April 2023 - Updated the volumes for making up CSB in the "Preparation of tissue samples for gDNA extraction" step
April 6th, 2023ULK_9177_v114_revE_27Nov2022EnglishMinion Download April 2023 - Updated the volumes for making up CSB in the "Preparation of tissue samples for gDNA extraction" step
February 9th, 2023ULK_9177_v114_revD_27Nov2022EnglishPromethion Download February 2023 - Removed the checklist download to fix formatting issues.
February 9th, 2023ULK_9177_v114_revD_27Nov2022EnglishGridion Download February 2023 - Removed the checklist download to fix formatting issues.
February 9th, 2023ULK_9177_v114_revD_27Nov2022EnglishMinion Download February 2023 - Removed the checklist download to fix formatting issues.
December 21st, 2022ULK_9177_v114_revC_27Nov2022EnglishPromethion Download December 2022 - Updated PromethION flow cell loading animations in both "Priming and loading the PromethION flow cell" and "Reloading ultra-long DNA library on a PromethION flow cell"
December 21st, 2022ULK_9177_v114_revC_27Nov2022EnglishGridion Download December 2022 - Updated PromethION flow cell loading animations in both "Priming and loading the PromethION flow cell" and "Reloading ultra-long DNA library on a PromethION flow cell"
December 21st, 2022ULK_9177_v114_revC_27Nov2022EnglishMinion Download December 2022 - Updated PromethION flow cell loading animations in both "Priming and loading the PromethION flow cell" and "Reloading ultra-long DNA library on a PromethION flow cell"
November 28th, 2022ULK_9177_v114_revB_27Nov2022EnglishPromethion Download -
November 28th, 2022ULK_9177_v114_revB_27Nov2022EnglishGridion Download -
November 28th, 2022ULK_9177_v114_revB_27Nov2022EnglishMinion Download -
November 27th, 2022ULK_9177_v114_revA_27Nov2022EnglishPromethion Download -
November 27th, 2022ULK_9177_v114_revA_27Nov2022EnglishGridion Download -
November 27th, 2022ULK_9177_v114_revA_27Nov2022EnglishMinion Download -
November 16th, 2022ULK114_RevB_v9EnglishPromethion Download -
November 16th, 2022ULK114_RevB_v9EnglishGridion Download -
November 16th, 2022ULK114_RevB_v9EnglishMinion Download -

Getting started

Buy a MinION starter pack Nanopore store Sequencing service providers Channel partners

Nanopore technology

Subscribe to Nanopore updates Resources and publications What is the Nanopore Community

About Oxford Nanopore

News Company timeline Sustainability Leadership team Media resources & contacts For investors For partners Working at Oxford Nanopore Current vacancies Commercial information BSI 27001 accreditationBSI 90001 accreditationBSI mark of trust
Spanish flag