11 December 2024
- Addition of links to MinION Mk1D IT requirements in "Compatibility of this protocol" and user manual in "Data acquisition and basecalling", "How to start sequencing".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
12/11/2024
ULK_9177_v114_revP_11Dec2024
English
MinION
11 December 2024
- Addition of links to MinION Mk1D IT requirements in "Compatibility of this protocol" and user manual in "Data acquisition and basecalling", "How to start sequencing".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
12/11/2024
ULK_9177_v114_revP_11Dec2024
English
PromethION
11 December 2024
- Addition of links to MinION Mk1D IT requirements in "Compatibility of this protocol" and user manual in "Data acquisition and basecalling", "How to start sequencing".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
7/2/2025
ULK_9177_v114_revP_11Dec2024
中文
GridION
11 December 2024
- Addition of links to MinION Mk1D IT requirements in "Compatibility of this protocol" and user manual in "Data acquisition and basecalling", "How to start sequencing".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
7/2/2025
ULK_9177_v114_revP_11Dec2024
中文
MinION
11 December 2024
- Addition of links to MinION Mk1D IT requirements in "Compatibility of this protocol" and user manual in "Data acquisition and basecalling", "How to start sequencing".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
7/2/2025
ULK_9177_v114_revP_11Dec2024
中文
PromethION
11 December 2024
- Addition of links to MinION Mk1D IT requirements in "Compatibility of this protocol" and user manual in "Data acquisition and basecalling", "How to start sequencing".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
11/27/2024
ULK_9177_v114_revO_27Nov2024
English
GridION
November 2024
- Updated layout of the "Introduction to the protocol" section to trimmed down format.
- Updated kit content to include new batch format with improved Precipitation Star (PS) manufacturing and different layout.
- Included instructions for "Clean-up" step in "Library preparation" for use with and without the Precipitation Star (PS) to accomodate users for older and newer batches of the kit.
11/27/2024
ULK_9177_v114_revO_27Nov2024
English
MinION
November 2024
- Updated layout of the "Introduction to the protocol" section to trimmed down format.
- Updated kit content to include new batch format with improved Precipitation Star (PS) manufacturing and different layout.
- Included instructions for "Clean-up" step in "Library preparation" for use with and without the Precipitation Star (PS) to accomodate users for older and newer batches of the kit.
11/27/2024
ULK_9177_v114_revO_27Nov2024
English
PromethION
November 2024
- Updated layout of the "Introduction to the protocol" section to trimmed down format.
- Updated kit content to include new batch format with improved Precipitation Star (PS) manufacturing and different layout.
- Included instructions for "Clean-up" step in "Library preparation" for use with and without the Precipitation Star (PS) to accomodate users for older and newer batches of the kit.
10/14/2024
ULK_9177_v114_revN_14Oct2024
English
GridION
14 October 2024
- Formatting updates to the sample preparation: uHMW gDNA extraction section of the protocol.
10/14/2024
ULK_9177_v114_revN_14Oct2024
English
MinION
14 October 2024
- Formatting updates to the sample preparation: uHMW gDNA extraction section of the protocol.
10/14/2024
ULK_9177_v114_revN_14Oct2024
English
PromethION
14 October 2024
- Formatting updates to the sample preparation: uHMW gDNA extraction section of the protocol.
6/21/2024
ULK_9177_v114_revM_27Nov2022
English
GridION
21 June 2024
- Throughout document replaced reference to "peripheral blood mononuclear cells (PBMCs)" with "white blood cells (WBCs)" to more accurately represent the samples obtained.
6/21/2024
ULK_9177_v114_revM_27Nov2022
English
MinION
21 June 2024
- Throughout document replaced reference to "peripheral blood mononuclear cells (PBMCs)" with "white blood cells (WBCs)" to more accurately represent the samples obtained.
6/21/2024
ULK_9177_v114_revM_27Nov2022
English
PromethION
21 June 2024
- Throughout document replaced reference to "peripheral blood mononuclear cells (PBMCs)" with "white blood cells (WBCs)" to more accurately represent the samples obtained.
07 February 2024
- gDNA quantification step made optional
- Updated the Clean-up stage of the protocol to new method NOT using the Precipitation Star (PS)
- Updated the Priming and loading the SpotON flow cell in the MinION/GridION branch to specify the MinION Flow Cell Light Shield should NOT be installed until after loading the DNA library.
- Updated Flow Cell loading instructions specific to ULK libraries
- Updated the Reloading ultra-long DNA library on both MinION/GridION and PromethION with updated wording and Flow Cell Wash protocol
- Links updated in the Priming and Loading flow cell section when referencing the "Reloading ultra-long DNA library" to take user to V14 protocol.
- Removed "Required settings in MinKNOW" as no longer required for run.
07 February 2024
- gDNA quantification step made optional
- Updated the Clean-up stage of the protocol to new method NOT using the Precipitation Star (PS)
- Updated the Priming and loading the SpotON flow cell in the MinION/GridION branch to specify the MinION Flow Cell Light Shield should NOT be installed until after loading the DNA library.
- Updated Flow Cell loading instructions specific to ULK libraries
- Updated the Reloading ultra-long DNA library on both MinION/GridION and PromethION with updated wording and Flow Cell Wash protocol
- Links updated in the Priming and Loading flow cell section when referencing the "Reloading ultra-long DNA library" to take user to V14 protocol.
- Removed "Required settings in MinKNOW" as no longer required for run.
07 February 2024
- gDNA quantification step made optional
- Updated the Clean-up stage of the protocol to new method NOT using the Precipitation Star (PS)
- Updated the Priming and loading the SpotON flow cell in the MinION/GridION branch to specify the MinION Flow Cell Light Shield should NOT be installed until after loading the DNA library.
- Updated Flow Cell loading instructions specific to ULK libraries
- Updated the Reloading ultra-long DNA library on both MinION/GridION and PromethION with updated wording and Flow Cell Wash protocol
- Links updated in the Priming and Loading flow cell section when referencing the "Reloading ultra-long DNA library" to take user to V14 protocol.
- Removed "Required settings in MinKNOW" as no longer required for run.
December 2022
- Updated PromethION flow cell loading animations in both "Priming and loading the PromethION flow cell" and "Reloading ultra-long DNA library on a PromethION flow cell"
December 2022
- Updated PromethION flow cell loading animations in both "Priming and loading the PromethION flow cell" and "Reloading ultra-long DNA library on a PromethION flow cell"
December 2022
- Updated PromethION flow cell loading animations in both "Priming and loading the PromethION flow cell" and "Reloading ultra-long DNA library on a PromethION flow cell"
ONT plc is a member of the producer compliance scheme run by ERP UK Ltd, who manage the submission of documentation in support of WEEE compliance for ONT plc’s manufacture and supply of Electrical and Electronic equipment in the UK.