02 July 2025
- Updated protocol introduction section to condensed format.
- Increased the timing for priming and loading the flow cell from 5 min to 10 min in Library preparation Table.
- Added P2i as a compatible device in 'Compatibility of this protocol'.
- Updated information for new kit format with increased Short Fragment Buffer (SFB) volume.
- Updated wash steps in the native barcode ligation section of the protocol to use SFB instead of 80% Ethanol.
- In section 6, 'Priming and loading the MinION and GridION Flow Cell', an important note was added to the bottom of the section stating that when a flow cell is inserted into the MinION Mk1D and the lid is closed, there will be a small gap around the sides of the device.
7/2/2025
NBA_9168_v114_revS_02Jul2025
English
MinION
02 July 2025
- Updated protocol introduction section to condensed format.
- Increased the timing for priming and loading the flow cell from 5 min to 10 min in Library preparation Table.
- Added P2i as a compatible device in 'Compatibility of this protocol'.
- Updated information for new kit format with increased Short Fragment Buffer (SFB) volume.
- Updated wash steps in the native barcode ligation section of the protocol to use SFB instead of 80% Ethanol.
- In section 6, 'Priming and loading the MinION and GridION Flow Cell', an important note was added to the bottom of the section stating that when a flow cell is inserted into the MinION Mk1D and the lid is closed, there will be a small gap around the sides of the device.
7/2/2025
NBA_9168_v114_revS_02Jul2025
English
PromethION
02 July 2025
- Updated protocol introduction section to condensed format.
- Increased the timing for priming and loading the flow cell from 5 min to 10 min in Library preparation Table.
- Added P2i as a compatible device in 'Compatibility of this protocol'.
- Updated information for new kit format with increased Short Fragment Buffer (SFB) volume.
- Updated wash steps in the native barcode ligation section of the protocol to use SFB instead of 80% Ethanol.
- In section 6, 'Priming and loading the MinION and GridION Flow Cell', an important note was added to the bottom of the section stating that when a flow cell is inserted into the MinION Mk1D and the lid is closed, there will be a small gap around the sides of the device.
1/30/2025
NBA_9168_v114_revR_30Jan2025
English
GridION
30th January 2025
In "Adapter ligation and clean-up". the instructions for preparing the LFB or SFB have been changed to: "Thaw either Long Fragment Buffer (LFB) or Short Fragment Buffer (SFB) at room temperature and mix by vortexing. Then spin down and keep at room temperature."
1/30/2025
NBA_9168_v114_revR_30Jan2025
English
MinION
30th January 2025
In "Adapter ligation and clean-up". the instructions for preparing the LFB or SFB have been changed to: "Thaw either Long Fragment Buffer (LFB) or Short Fragment Buffer (SFB) at room temperature and mix by vortexing. Then spin down and keep at room temperature."
1/30/2025
NBA_9168_v114_revR_30Jan2025
English
PromethION
30th January 2025
In "Adapter ligation and clean-up". the instructions for preparing the LFB or SFB have been changed to: "Thaw either Long Fragment Buffer (LFB) or Short Fragment Buffer (SFB) at room temperature and mix by vortexing. Then spin down and keep at room temperature."
12/12/2024
NBA_9168_v114_revQ_12Dec2024
English
GridION
12 December 2024
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual in "Data acquisition and basecalling", "How to start sequencing".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during a sequencing run", "Failed to reach target temperature".
12/12/2024
NBA_9168_v114_revQ_12Dec2024
English
MinION
12 December 2024
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual in "Data acquisition and basecalling", "How to start sequencing".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during a sequencing run", "Failed to reach target temperature".
12/12/2024
NBA_9168_v114_revQ_12Dec2024
English
PromethION
12 December 2024
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual in "Data acquisition and basecalling", "How to start sequencing".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during a sequencing run", "Failed to reach target temperature".
11/15/2024
NBA_9168_v114_revP_20Nov2024
English
GridION
November 2024
- Updated kit content information and image to include new kit format of SQK-NBD114.24 with plated native barcodes.
11/15/2024
NBA_9168_v114_revP_20Nov2024
English
MinION
November 2024
- Updated kit content information and image to include new kit format of SQK-NBD114.24 with plated native barcodes.
11/15/2024
NBA_9168_v114_revP_20Nov2024
English
PromethION
November 2024
- Updated kit content information and image to include new kit format of SQK-NBD114.24 with plated native barcodes.
8/21/2024
NBA_9168_v114_revO_15Sep2022
English
GridION
21st August 2024
- Removed Early access loading now that kit is in "released" phase.
- Removed reference to duplex sequencing.
- Updated flow cell loading recommendations based off input fragment size.
8/21/2024
NBA_9168_v114_revO_15Sep2022
English
MinION
21st August 2024
- Removed Early access loading now that kit is in "released" phase.
- Removed reference to duplex sequencing.
- Updated flow cell loading recommendations based off input fragment size.
8/21/2024
NBA_9168_v114_revO_15Sep2022
English
PromethION
21st August 2024
- Removed Early access loading now that kit is in "released" phase.
- Removed reference to duplex sequencing.
- Updated flow cell loading recommendations based off input fragment size.
21st September 2023
- Updated flow cell loading instructions to include light shield installation
- Format change in "Native barcode ligation" step to fix downloaded checklist.
21st September 2023
- Updated flow cell loading instructions to include light shield installation
- Format change in "Native barcode ligation" step to fix downloaded checklist.
21st September 2023
- Updated flow cell loading instructions to include light shield installation
- Format change in "Native barcode ligation" step to fix downloaded checklist.
14th August 2023
- Updated the equipment and consumables with both formats of kits which are being shipped.
- Updated the native barcoding ligation step to include instructions for both EDTA concentrations.
- Updated flow cell flushing instructions to include instructions for the bottle format kit.
14th August 2023
- Updated the equipment and consumables with both formats of kits which are being shipped.
- Updated the native barcoding ligation step to include instructions for both EDTA concentrations.
- Updated flow cell flushing instructions to include instructions for the bottle format kit.
14th August 2023
- Updated the equipment and consumables with both formats of kits which are being shipped.
- Updated the native barcoding ligation step to include instructions for both EDTA concentrations.
- Updated flow cell flushing instructions to include instructions for the bottle format kit.
March 2023
- Updated end-prep step to show the tip for making up an end-prep mastermix before combining the reagents.
- Corrected the expected volumes for pooled samples and the reflected in the AXP volumes.
March 2023
- Updated end-prep step to show the tip for making up an end-prep mastermix before combining the reagents.
- Corrected the expected volumes for pooled samples and the reflected in the AXP volumes.
March 2023
- Updated end-prep step to show the tip for making up an end-prep mastermix before combining the reagents.
- Corrected the expected volumes for pooled samples and the reflected in the AXP volumes.
18th October 2022
- Updated equipment and consumables to remove reference to the NEBNext Companion Module for Oxford Nanopore Technologies Ligation Sequencing
18th October 2022
- Updated equipment and consumables to remove reference to the NEBNext Companion Module for Oxford Nanopore Technologies Ligation Sequencing
18th October 2022
- Updated equipment and consumables to remove reference to the NEBNext Companion Module for Oxford Nanopore Technologies Ligation Sequencing
ONT plc is a member of the producer compliance scheme run by ERP UK Ltd, who manage the submission of documentation in support of WEEE compliance for ONT plc’s manufacture and supply of Electrical and Electronic equipment in the UK.